Scroll left
  • Before<br /><br />The interior before the remodel. Note the large amount of paneling and high platform. width:300;;height:190
  • Front<br /><br />Detail of the front of the church. width:317;;height:480
  • Pews<br /><br />The pews are dismantled and removed. width:640;;height:422
  • Empty width:640;;height:422
  • Paneling gone<br /><br />The pews are gone and the paneling has been removed. width:640;;height:423
  • Front of sanctuary<br /><br />The pews are gone and the paneling has been removed. width:640;;height:423
  • Services<br /><br />Services were held in the Fellowship hall during the remodeling. width:640;;height:422
  • Remove slate<br /><br />Removing the damaged slate from the foyer. width:640;;height:423
  • Carpet<br /><br />When the carpet was removed we discovered the original carpet (in the isle) and the tile that was under the pews. width:640;;height:423
  • Platform<br /><br />The platform is stripped and prep'd to be lowered. width:640;;height:423
  • Drywall<br /><br />Drywall starts going up to replace the removed paneling. width:640;;height:423
  • Trash pile<br /><br />Working the trash pile. Everything had to be cut into small pieces to fit in the trash bin. width:640;;height:423
  • Trench<br /><br />A trench was dug in the floor from the where the PA cabinet will be to the stage. This was cheaper than running cooper wire following a longer path. width:640;;height:423
  • Trench<br /><br />A trench was dug in the floor from the where the PA cabinet will be to the stage. This was cheaper than running cooper wire following a longer path. width:640;;height:423
  • Paint<br /><br />The baptistery back wall is painted blue. width:317;;height:480
  • Paint<br /><br />Much of the interior is painted. This is the back wall. The shelf is where the video projector will be placed. width:640;;height:423
  • Lowered platform<br /><br />The platform is lowered to its new height. width:640;;height:423
  • Screen<br /><br />The screen is hung. The bracing is for the old curtains and will be removed. width:640;;height:423
  • Screen<br /><br />The screen down. It also has a simple cover. The stained glass window is still visible when the screen is down. Note that part of the ceiling has been painted already. width:640;;height:423
  • Platform wall<br /><br />The platform back wall is rebuilt. The columns are extended down to the new platform height. width:640;;height:423
  • Platform<br /><br />Platform is mostly done. Stairs are in. Plywood is down. The doors have been lowered to the new height. Here they are wiring for the new PA system. width:640;;height:423
  • Spots<br /><br />The spots lights go in. Finally, some lights for the platform! width:378;;height:474
  • Finished<br /><br />The finished product. The new carpet is down, the refurbished pews are in and all the painting is done. width:316;;height:480
  • Finshed<br /><br />Looking from the platform towards the pews. This is the monitor that displays what is on the big screen to the pastor. It's also a good detail shot of the carpet. width:640;;height:423
  • Finished<br /><br />Finished shot with the screen up. It still looks wonderful! Since this picture was taken some other changes have taken place (greenery added), so it doesn't look so plain.<br /><br />We have been blessed by what God has done to remodel His house. This is just a brief overview of what has happened. The stories of God leading, not only in the remodeling building - but also in the remodeling of our lives, have been nothing short of miraculous. God is good!<br /><br />Please stop by and visit if you are in our neighborhood. width:316;;height:480
Scroll right